New Construction Garage Doors in Thornton

New Construction Garage Doors in Thornton

Raised-panel doors installed in a new detached garage while siding was still going on.

A builder in Thornton needed doors installed before the siding crew finished so the structure could be closed up. We measured the rough openings, confirmed headroom and side room, and installed a single and a double raised-panel door in an almond finish.

Because the jambs were fresh lumber, we used extra lag bolts into the framing and left the perimeter seal ready for the trim carpenter. Openers were wired once the electrician had power to the garage.

Related service: Garage Door Installation.

Rough openings verified
Single and double doors
Almond raised-panel finish
Hardware lagged to framing
Openers installed
Builder walk-through
Single raised-panel garage door on new construction
Double almond garage door on a new garage in Thornton

Project Overview

Service Type:

New Construction

Location:

Thornton, Colorado

Completed:

May 2026

Time on Site:

1 day

Get a Similar Quote

“They worked around our schedule and had both doors up before the siding crew needed the space.”

– Jordan H., builder, Thornton